The equipment for this job is mounted in the third floor mechanical room. A penetration had to be made through the roof and a 1 1/2″ PVC was inserted. On the room was a junction box with 1″ PVC going to the front and back of the building. 7 cameras in total were mounted along the perimeter.

Leave a Reply

Your email address will not be published. Required fields are marked *